Einsteinsys is welcoming OPT/CPT/H4/H1//GC/ Citizens Freshers & Experienced Professionals for online IT Training & Placements, Both weekdays and weekends training available. For more information Please feel free to Email at: training@einsteinsys.com or feel free to call at (347-625-6179.
Training consists of about 45 hours that covers Quality Assurance
Testing on BFSI Verticals (Banking, Financial Services &
Insurance) and Mobile Channels.
QA TRAINING CURRICULUM
General overview of SDLC (Software development life cycle) and
QALC (Quality Assurance life cycle) Role of QA during the course of SDLC
Role of QA during the course of QALCQA methodology
Manual Testing: Identifying the scope. Identifying the functionality, decomposing the Functional specifications, Preparing the Test Strategy, Preparing the Test Plan, Preparing Test scenarios
Preparing Test Cases, Executing Test cases, Function Testing, Database testing User Interface testing System Testing Integration Testing Verification Regression Testing Use acceptance Testing, Reporting Bugs, Monitoring Bug Life cycle, Establishing Builds, QA build Staging build
Integration build Production
Smoke testing the environment for stability, Automated testing (Mercury and Rational suite)
Need for automation Comparison between automation and manual Advantages of automation
Disadvantages of automation Regression Testing (Win runner & QTP)
Writing Automation scripts
Concepts of Test Scripting Language and VBScript Record/Play Custom Functions
Parameterization, Identifying checkpoints, Data-driven Testing, Scheduling automated tests
Analyzing the results Reporting issues/bugs
Load/Performance Testing (Load runner & Rational Robot)
Differences between various types of load testing Capacity Overall Performance Stress capabilities
Reliability/Endurance Background Testing Scalability/Benchmarking
Writing Load Test Scripts: Loading Load scenarios Creating rendezvous point Creating Virtual Users using the VU generator Running scenarios using the Controller. Parameterization Data-driven testing. Analyzing the results: Hits per second Throughput Bandwidth Latency System Response Identifying the bottlenecks Reporting bottlenecks
Bug Reporting tool: Test Director, Test director administration Adding Users Assigning Roles
Implement Trace-ability Matrix Define the bug cycle Bug reporting Severity Priority Assigning Status Change r